Installations & Solutions
A Unique Problem Solving Experience
Designing the right collection system calls for a special problem-solving capability, using the HSE HSG258 guide lines to bench mark the exact combination of collector, capture hoods, ducting and ancillary equipment. The factory layout, the manufacturing process, materials used and the specific HSE & Environmental legislation are all taken into account.
The System also has to be right for the needs of today and allow for the best and most economical means of production in the future.
Air Movement System personnel have up to 40 years of experience and have attained the P602 qualifications, assuring you that we meet the highest standard in the designing of the LEV systems. We can deliver quality, design engineering and performance at an affordable price.







